TTI TEX&TURNKEY INTERIORS Start a project
SHEET 00 — COVERDUBAI INVESTMENT PARK 2, U.A.E.25.0°N 55.1°EDESIGN · SOURCING · SUPPLY · EXECUTION

Beyond interiors,
into experiences.

Refined interiors for luxury hotels, residences and commercial projects, backed by global sourcing and expert execution. One partner from the first drawing to the final installed detail.

View the work How we deliver
Travertine-clad suite with a shaft of late sun across the headboard
FIG. 01SUITE — TRAVERTINE, WALNUT, LINEN
01 / PRACTICE

We work from your drawings, not around them. Decades of hospitality and residential delivery mean the intent of the architect survives every stage: specification, sourcing, supply and site.

02 / METHOD

Four stages. One line of responsibility.

A single team holds the drawing set from concept to handover, so nothing is lost between consultants, suppliers and contractors.

01 ——

Design

Concept development, detailed design and FF&E specification, coordinated with the project architect and operator brand standards.

Floor plan with scale rule and material samples
02 ——

Sourcing →

A global network of mills, quarries, workshops and makers. Samples, mock-ups and approvals before a single order is placed.

Book-matched marble slabs in a stone yard
03 ——

Supply

Manufacturing oversight, quality inspection, logistics and warehousing from our Dubai base, sequenced to the site programme.

Wrapped bespoke furniture on pallets in a daylit warehouse
04 ——

Execution

Installation, fit-out and snagging by our own teams, through to a handover that matches the drawings line for line.

Gloved hands setting a brass trim into a travertine wall on site
03 / SCHEDULE OF WORKS

Selected projects

View all projects →
Royal Atlantis, DubaiP.01 — ROYAL ATLANTIS
One Za'abeel, One&Only, DubaiP.02 — ONE ZA'ABEEL
Shebara Resort, Red SeaP.03 — SHEBARA RESORT
NO.PROJECTLOCATIONSECTORSCOPE
P.01Royal AtlantisDubai, U.A.E.Hospitality / Residences[SCOPE]
P.02One Za'abeel, One&OnlyDubai, U.A.E.Hospitality[SCOPE]
P.03Shebara Resort, Red SeaK.S.A.Resort[SCOPE]
Oak cabinet corner with a bronze-lined shadow gap
04 / DETAIL

The 3 mm that matter.

Shadow gaps, stone book-matching, veneer sequencing, hardware finishes. Our mock-up and approvals process exists so the detail you drew is the detail that gets built.

SECTORS
Hotels · Residences · Commercial
REGIONS
U.A.E. · K.S.A. · [MORE]
BASE
Dubai Investment Park 2
EXPERIENCE
[YEARS] years
05 / TECHNOLOGY

Tex & Turnkey Technology: [ONE LINE ON WHAT THE TECHNOLOGY ARM DOES].

Explore technology →